Saturday is the day that we, under normal circumstances, work at and in our clubhouse.

Some time ago I was telling you about the brick wall behind the staircase and I showed a photo of Jezus laying the first layer of stones. I also told about our club logo of metal to be placed in the wall. That all is finished by now. The free space behind the wall is for hanging your coat etc. That and the paneling only need a bit of paint and this particular corner is ready as well. The ceiling in the toilet is now ready also, Only upstairs a lot needs to be done still.
The bar is as good as finished to.

Brembo filling the fridge with beer bottles